top of page

MARINE & OFFSHORE.

Viva Bahriya floating pontoon removal

The Pearl Qatar keeps improving its infrastructure for both cars and boats. For this project, around 80 pieces of floating pontoons had to be removed from the Viva Bahriya Marina. A perfect job for the Hitachi SCX2800. In just a matter of days all the pontoons were safely lifted out and transported to a new location. 

Fujairah Oil terminal (UAE)

AMS was contacted to execute the vibro hammering activities to prepare the Quay wall

For this project different mobile cranes between 40 and 400Ton  were mobilized.

Construction of 400m long concrete block quay wall at Jebel Ali – Dubai (UAE)

Extension of Container Terminal 2 at Jebel Ali Port.

Construction of 400m long concrete block quay wall along with associated dredging and marine accessories.

Installation of crane rails together with foundation works.

AMS installed water chambers with our Hitachi SCX 2800 crawler crane.

Rehabilitation of Berth 4 at Ras Laffan (QA)

AMS executed crane works for Rehabilitation of Berth 4 and placed +100 wall blocks from barge.

Please reload

bottom of page